THE AYVALIK MOSAIC – Brasilia twelfth week

Its done!

The first piece of the mosaic is ready to be mounted.

The rental contract of the studio is signed.

The boxes with all the mosaic stuff are packed again to be moved from our house to their hopefully permanent home for the next 3 years.

IMG_6024

I would love to present you with all parts mounted together on photoshop, but my photoshop skills are non existent ;( So your imagination has to do this 🙂

IMG_5357
Part 1
IMG_6025
parts 2&3
IMG_6017
the studio
IMG_6014
the view I am looking forward too in January
IMG_6020
my new neighbors: Cida Carvalho and her students

This is the last post for this year. I wish you all a peaceful rest. I am looking forward to write to you again from the new studio.

 

THE AYVALIK MOSAIC – Brasilia eleventh week

This week I managed to have two days of very concentrated work on the background. I discovered that if I set my phone to “do not disturb mode”  helps not to jump at every incoming sound of messages from the outside world.

And I managed to do  a lot:

IMG_5975